Louisiana DOTD's Home Page Louisiana DOTD's Home Page
PERBA (Permits Electronic Routing and Bridge Analysis)
Origin
 
Travel OriginCAMERON
 
Destination
 
Travel Destination: WELSH
 
Details
 
StatusInactive
Inactive Status ReasonConstruction CAMERON FERRY CLOSED 7-30-18 1 WK
Route 82-27-14-397-I10-99-90
Mileage51
Maximum Height15' 6"
Maximum Width16' 0"
Maximum Length125' 0"
Maximum Gross Weight232000 lbs.
Comments / Notes
Restrictions & Comments
Must have permission from Captain to cross Cameron Ferry@337-775-7444