PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | CUT OFF |
  | |
Destination |
  | |
Travel Destination: | NEW ORLEANS |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction BRIDGE 308SP/3162 CLOSED 9-7-18 1 WK |
Route | 308-3162-3235-657-308-TI BOIS BRIDGE-1-90-I310-I10-90B-CS |
Mileage | 51 |
Maximum Height | 15' 6" |
Maximum Width | 14' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
Contact City of New Orleans at 504-658-8040 to obtain a city permit
Contact New Orleans PD for loads over 13’ 6” H, 12’ W or 90’ L on all non-interstate routes @504-658-6205 |
|
|
|