PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | BELLE ROSE |
  | |
Destination |
  | |
Travel Destination: | CARENCRO |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction 996 1/2 MILE NORTH OF LA 70 START 2-26-18 SHT TIME |
Route | 996-70-22-I10-I49-726-I49 SER RD |
Mileage | 101 |
Maximum Height | 15' 1" |
Maximum Width | 16' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|