Louisiana DOTD's Home Page Louisiana DOTD's Home Page
PERBA (Permits Electronic Routing and Bridge Analysis)
Origin
 
Travel OriginBATON ROUGE
 
Destination
 
Travel Destination: CAMERON
 
Details
 
StatusInactive
Inactive Status ReasonConstruction CAMERON FERRY CLOSED 7-30-18 1 WK
Route CS-190-61-I12-I10-I210-I10-1256-27-82
Mileage200
Maximum Height14' 0"
Maximum Width12' 0"
Maximum Length125' "
Maximum Gross Weight232000 lbs.
Comments / Notes
Restrictions & Comments
Contact Baton Rouge PD on all non-interstate routes for loads over 14’ H, 12’ W or 90’ L—M/H’s 14’ H, 16’ W or 100’ L (overall)@225-389-3874
Must have permission from Captain to cross Cameron Ferry@337-775-7444