PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | CREOLE |
  | |
Destination |
  | |
Travel Destination: | CENTERVILLE |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction 14 start 1-14-19 appox 3 mnths |
Route | 27-14-380-26-14-14BYPASS-14-90-317 |
Mileage | 151 |
Maximum Height | 15' 6" |
Maximum Width | 16' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|