PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | EUNICE |
  | |
Destination |
  | |
Travel Destination: | ENON |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction 1072 START 1-7-19 FOR A FEW DAYS |
Route | 190-I49-I10-I12-I55-16-1072-PR |
Mileage | 151 |
Maximum Height | 15' 4" |
Maximum Width | 12' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|