PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | COUSHATTA |
  | |
Destination |
  | |
Travel Destination: | CARMEL |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction ON RR 509 START 1-31-18 SHT TIME |
Route | PR-371-I49-509-PR |
Mileage | 50 |
Maximum Height | 15' 6" |
Maximum Width | 16' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|