PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | CUT OFF |
  | |
Destination |
  | |
Travel Destination: | RAYNE |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction START 5-24-18 THRU 8-2018 |
Route | 3235-657-308-TI BOIS BRIDGE-1-90-LAKE PALOURDE BYPASS-182-90@MORGAN CITY-167-I10-95-1096 |
Mileage | 151 |
Maximum Height | 15' 6" |
Maximum Width | 16' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|