PERBA (Permits Electronic Routing and Bridge Analysis) |
|
Origin | |
  | |
Travel Origin | EAST POINT |
  | |
Destination |
  | |
Travel Destination: | DUSON |
  | |
Details |
  | |
Status | Inactive |
Inactive Status Reason | Construction BRIDGE OVER COUSHATTA BAYOU START 5-29-18 2 WKS |
Route | 515-71-371-I49-I10-95 |
Mileage | 201 |
Maximum Height | 15' 6" |
Maximum Width | 16' 0" |
Maximum Length | 125' 0" |
Maximum Gross Weight | 232000 lbs. |
Comments / Notes | |
| |
Restrictions & Comments |
|
|
|
|